PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed ductwork fitings at the 3rd floor Facing West.jpg Installed motorized dampers at the 2nd floor Facing West.jpg Installed roof curbs at the high roof Facing East.jpg Roof curbs at the High Roof Facing South.jpg Run electrical wiring for the 2nd floor motorized dampers Facing North.jpg Started 3rd floor Electrical rouging Facing North 1.jpg Started 3rd floor Electrical rouging Facing North 2.jpg Started laying out block at the the low roof Facing South.jpg
Previous pageNext page Run electrical wiring for the 2nd floor motorized dampers Facing North
Run electrical wiring for the 2nd floor motorized dampers Facing North